Current Projects

Meadow Lake Transmission Main, Segment B-E (Steel Reservoir to Yamhill St.) ($1,815,300)

This project entails the construction of approximately 8,200 feet of new 18-inch water transmission line from the City’s steel reservoir west of town to the downtown distribution grid at the intersection of Main and Yamhill Street.

The Regional Solutions Project includes improvements to a number of waterlines within the downtown business district. ($831,700)

This list includes a new 12 inch line from Main & Yamhill to Grant St and east to S. Pine, a new 10 inch line form Main & Yamhill to Kutch St., a new 12 inch line from Main & Yamhill to Monroe then east to Kutch, and a new 12 inch line from Kutch and Monroe to Pine & Monroe then south to Pine and E. Main St.

Concrete Reservoir Upgrade. ($203,000)

This project will replace a number of structural components of the concrete reservoir that are failing. The improvements include a new roof, new siding, new catwalk, and new truss rods. The project will also include the addition of lights inside the reservoir and a new liquid level control system.

Water Treatment Plant Intertie with McMinnville Water and Light. ($150,000)

This project is designed to provide an emergency water connection from the City of McMinnville’s treated water transmission line to Carlton’s water treatment plant.